History
“Templeborough Power Station (also known as Templeborough biomass power plant) is a biomass power station situated in Templeborough on the River Don in Rotherham England. Operated by Copenhagen Infrastructure Partners, it opened in 2018 with an operating capacity of 44 megawatts.
The biomass plant is being built on the site of a former steelworks and besides the plant itself, it consists of ancillary buildings such as a pelletiser plant to convert the biomass to pellets before it is burnt. The biomass is delivered to the site by Stobart company who will maintain a presence on the site and separately at Rotherham DB Schenker railway sidings.”
Source: https://en.wikipedia.org/wiki/Templeborough_Power_Station